|
Date::
|
Center::
|
Description::
|
| FY 91-95 |
Glenn |
Establishment of wiring requirements (spacecraft)
New Wire construction
|
| |
|
- Workshops
with NASA, DoD, FAA, ESA |
| |
|
July 1991 Operational Expertise
and wiring requirements |
| |
|
July 1993 Space
Wiring Failures/ wire constructions/ Test |
| |
|
July 1995 System Topologies/
wire testing |
| FY 99-00 |
KSC/JSC/MSFC |
Space Shuttle Wiring Review, inspection, and
resolution
|
| |
|
- Age Life
Study |
| |
|
- Critical
Redundancy |
| |
|
- Arc Track
Testing |
| |
|
- Visual Inspection
and wire protection study |
| FY 99-00 |
Ames |
WIRe Study |
| |
|
- "Ames Research
Center has completed a survey and evaluation of automated wire integrity
assessment equipment and test management software, available in the
two-part Wire Integrity Research (WIRe) Pilot Study, available for
download". |
| |
|
"Wire
Integrity Research Pilot Study Final Report - Part I, Main Body" Part
II,
Appendices.
Contact: jcockrell@mail.arc.nasa.gov |
| FY 00 |
Ames/JSC/KSC |
NASA Cross-Center
Wiring Working Group Formation |
| |
Glenn/LaRC |
-
Introduction |
| |
|
- Areas of
Emphasis (draft) |
| |
LaRC |
Development of NDE technology
for wire inspection under |
| |
|
IRS program. |